新疆昌吉州打造千万千瓦级新能源基地
责任编辑:cnlng    浏览:39次    时间: 2024-12-11 16:04:23    | 来源:中国新闻网   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要: 乌鲁木齐12月11日电 (陶拴科)“昌吉州已探明矿产40余种,煤炭、石油储量占新疆的26%、11%,风光电资源371.7吉瓦,是全疆千万千瓦级新能源基地之一。”10日,新疆昌吉回族自治州党委副书记、州长郑敏说。 Urumqi, December 11 (Tao Shuanke..

关键词:昌吉、新能源
分享到:

       乌鲁木齐12月11日电 (陶拴科)“昌吉州已探明矿产40余种,煤炭、石油储量占新疆的26%、11%,风光电资源371.7吉瓦,是全疆千万千瓦级新能源基地之一。”10日,新疆昌吉回族自治州党委副书记、州长郑敏说。                                    

         Urumqi, December 11 (Tao Shuanke) "Changji has proved more than 40 kinds of minerals, coal, oil reserves accounted for 26% of Xinjiang, 11%, wind and electricity resources 371.7 GW, is one of the 10 million kilowatt level of new energy bases in Xinjiang." Zheng Min, deputy Party secretary and governor of the Hui Autonomous Prefecture of Changji, Xinjiang, said Wednesday.

  当日,“新疆推动高质量发展”系列主题新闻发布会在乌鲁木齐市举行,郑敏介绍了近年来昌吉州加快新型工业化、推动经济高质量发展有关情况。

       On the same day, a series of themed press conferences on "Xinjiang promotes high-quality Development"  were held in  Urumqi, and Zheng  Min introduced  the situation  of  accelerating  new industrialization and promoting high-quality economic development in  Changji  Prefecture  in recent  years.

新闻发布会现场。陶拴科 摄

The press conference. Photo by Tao Yanke

  2023年,昌吉州规上工业总产值突破2500亿元,居新疆首位;2024年规上工业企业达590家,增加值保持大基数下两位数增长。

       In 2023, the total industrial output value of Changji Prefecture exceeded 250 billion yuan, ranking first in Xinjiang; In 2024, the number of industrial enterprises will reach 590, and the added value will maintain double-digit growth under a large base.

  资料表明,昌吉州煤炭、多晶硅、电解铝产能占新疆一半,煤电装机超3200万千瓦、全疆第一,在建及开展前期的新能源项目超4200万千瓦,并网规模年内突破1500万千瓦。

        Data show that Changji coal, polysilcrystal, electrolytic aluminum production capacity accounted for half of Xinjiang, coal power installed capacity of more than 32 million kilowatts, the first in Xinjiang, new energy projects under construction and in the early stage of more than 42 million kilowatts, grid-connected scale exceeded 15 million kilowatts within the year.

  郑敏介绍,昌吉州巩固提升优势产业,重点打造煤基、铝基、硅基3个千亿级和油气、粮油、纺织、畜产品4个百亿级产业集群;瞄准“强链提质”,实施286个延链补链项目,完成工业固投554.7亿元;培育壮大新兴产业,集聚落地一批光伏组件、风机、储能装备等制造企业,推动新能源项目与新能源装备制造实现“两翼齐飞”。

        Zheng Min introduced that Changji Prefecture consolidated and promoted advantageous industries, focusing on building coal, aluminum, silicon based 300 billion level and oil and gas, grain and oil, textile, animal products 4 billion level industrial clusters; Aiming at "strong chain and improving quality", 286 chain extension and chain supplement projects were implemented, and 55.47 billion yuan of industrial fixed investment was completed; Cultivate and strengthen emerging industries, gather a number of photovoltaic modules, fans, energy storage equipment and other manufacturing enterprises, and promote new energy projects and new energy equipment manufacturing to achieve "two wings."

  准东经济技术开发区是新疆首个千亿级产业园区,已建成全国单体产能最大的绿色智慧矿山,“疆煤外运”突破5000万吨,每年“疆电外送”620亿度、其中绿电比例超过30%,外送电量可供应7000万户家庭一年的用电,60亿立方米煤制气项目加快推进,已成为国家“三基地一通道”的重要支点。

         Zhundong Economic and Technological Development Zone is Xinjiang's first 100 billion industrial park, has built the country's largest single production capacity of green smart mine, "Xinjiang coal transport" exceeded 50 million tons, the annual "Xinjiang electricity" 62 billion KWH, of which the proportion of green electricity more than 30%, the exported electricity can supply 70 million households a year's electricity, 6 billion cubic meters of coal to gas project accelerated. It has become an important fulcrum of the country's "three bases and one channel".

】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部