大型LNG储罐试桩设计问题分析
责任编辑:cnlng    浏览:658次    时间: 2024-04-03 10:17:39      

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:摘要液化天然气(LNG)储罐在LNG接收站中占据核心地位,试桩工程位于LNG工程的前端。为优化大型LNG储罐工程试桩工程,为后期同类型试桩工程提供设计参考和工程借鉴,以一实际LNG工程的试桩设计与施工为背景,研究分析LNG工...展开更多The LNG storage tank occupies a cent..

分享到:
摘要液化天然气(LNG)储罐在LNG接收站中占据核心地位,试桩工程位于LNG工程的前端。为优化大型LNG储罐工程试桩工程,为后期同类型试桩工程提供设计参考和工程借鉴,以一实际LNG工程的试桩设计与施工为背景,研究分析LNG工...展开更多The LNG storage tank occupies a central position in the LNG receiving station,and the test pile project is located at the front end of the LNG project.In order to optimize the test pile engineering of large-scale liquefied natural gas(LNG)storage tank engineering,so as ...MORE
作者张雨Zhang Yu(Offshore Oil Engineering Co.,Ltd.,Tianjin 300457,China)
出处《山东化工》 CAS 2023年第8期206-208,212,共4页Shandong Chemical Industry
关键词试桩 大直径灌注桩 LNG 静载试验 承载力test pile large diameter driven cast-in-place pile LNG static loading test bearing capacity


】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部