哈电锅炉参与建设的白音华机组实现月内双投
责任编辑:cnlng    浏览:481次    时间: 2024-06-21 10:35:58    | 来源:哈锅之声   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:白音华项目是国家发展和改革委员会的重点保供项目,承担着锡盟-泰州高压直流输变电工程的保供任务,机组每年可发电66亿度,相当于230万户家庭一年的用电量,项目建设对于推动经济社会发展意义重大。两台机组的顺利投产得益于哈电锅炉高效的兑现合同以及过硬的产品质..

分享到:

白音华项目是国家发展和改革委员会的重点保供项目,承担着锡盟-泰州高压直流输变电工程的保供任务,机组每年可发电66亿度,相当于230万户家庭一年的用电量,项目建设对于推动经济社会发展意义重大。两台机组的顺利投产得益于哈电锅炉高效的兑现合同以及过硬的产品质量和细致的服务保障。

按期兑现合同是哈电锅炉的第一要务。在兑现合同过程中,哈电锅炉时刻与用户保持着密切沟通,以机组投产时间节点为准倒排包装运输、生产制造、原材料采购、技术准备等重要环节工作的完成时间节点,充分利用人员、设备、场地、供货厂家等资源,集中力量兑现合同,各环节工作无缝衔接,兑现合同蹄疾步稳。

提供让用户满意的产品和服务质量是哈电锅炉的工作准则。哈电锅炉参与该项目建设的各部门严格落实“三级书记抓质量”工作要求,牢固树立一次把工作干好的理念,采取有力举措从设计源头提升质量。坚持下道工序就是用户的理念,严格管控原材料供货质量和产品生产质量,确保产品质量过硬。得益于过硬的产品质量,锅炉设备在试运行期间状态稳定,各项参数指标优异。另外,随着项目建设进入到设备现场安装阶段,哈电锅炉选派安装服务代表进驻到项目现场,为用户提供精准服务。安装服务代表积极回应用户关切,及时、高效、妥善处理现场安装问题,服务质量得到用户高度认可。

Baiyinhua project is a key supply guarantee project of the National Development and Reform Commission, and undertakes the task of guaranteeing the supply of Ximeng-Taizhou HVDC power transmission and transformation project. The unit can generate 6.6 billion KWH of electricity per year, equivalent to the annual electricity consumption of 2.3 million households. The project construction is of great significance for promoting economic and social development. The smooth operation of the two units benefited from the efficient fulfillment of the contract and excellent product quality and meticulous service guarantee of Harbin Electric boiler.

To fulfill the contract on time is the first priority of Harbin electric boiler. In the process of fulfilling the contract, Harbin electric boiler always maintains close communication with the user, inverting the completion time node of important links such as packaging and transportation, production and manufacturing, raw material procurement, and technical preparation, making full use of personnel, equipment, venues, suppliers and other resources, concentrating on fulfilling the contract, and seamlessly connecting the work in each link. Make good on the contract quickly and steadily.

To provide customers with satisfactory product and service quality is the working principle of Harbin electric boiler. The various departments involved in the construction of the project strictly implement the work requirements of the "three-level secretary to grasp the quality", firmly establish the concept of doing a good job once, and take strong measures to improve the quality from the design source. Adhere to the concept that the next process is the user, strictly control the quality of raw material supply and product production quality, and ensure that the product quality is excellent. Thanks to the excellent product quality, the boiler equipment is stable during the trial operation, and the parameters are excellent. In addition, with the project construction entering the stage of on-site installation of equipment, Harbin electric boiler selected installation service representatives to enter the project site to provide users with accurate services. Installation service representatives actively respond to user concerns, timely, efficient, and properly handle on-site installation problems, and the quality of service is highly recognized by users.


】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部
今日热点