玛尔挡水电站年累计发电量超5亿千瓦时
责任编辑:cnlng    浏览:813次    时间: 2024-07-03 13:40:44    | 来源:国家能源集团青海公司之声   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:自投产发电以来,该电站积极践行集团公司“一个目标、三个作用、六个担当”发展战略和“41663”总体工作方针,牢固树立“度电必争,度电必抢”理念,全力以赴抢发电量。强化生产调度管理,加强设备管理,确保隐患问题早发现、早处置,保障设备安全稳定运行;加大巡检..

分享到:

自投产发电以来,该电站积极践行集团公司“一个目标、三个作用、六个担当”发展战略和“41663”总体工作方针,牢固树立“度电必争,度电必抢”理念,全力以赴抢发电量。强化生产调度管理,加强设备管理,确保隐患问题早发现、早处置,保障设备安全稳定运行;加大巡检巡查力度,分区域加强巡回检查,尤其是对重点区域、重点部位、重点设备加强巡检,特别是在汛期,结合水情信息,做好相应应急处置,保障机组时刻处于最佳运行状态,全力以赴确保迎峰度夏能源保供万无一失;推进隐患排查治理,细化优化调整参数,合理安排设备消缺,对现场发现的隐患和异常第一时间联系处理,针对易发频发故障,细致查找问题根源对症施策,不断提升机组可靠性。

与此同时,玛尔挡水电站运行人员时刻关注水位变化,积极与黄委交流信息,及时掌握水情信息,预估来水量,并与省调沟通协调,调整负荷,力争机组满负荷运行或者按最优工况运行,以创造出更好的发电效益。

Since the production of power generation, the power station has actively implemented the development strategy of the Group company "one goal, three roles, six responsibilities" and the overall work policy of "41663", firmly established the concept of "power must fight, power must grab", and go all out to grab power generation. Strengthen production scheduling management, strengthen equipment management, ensure that hidden problems are discovered and disposed of early, and ensure the safe and stable operation of equipment; Increase the intensity of inspection and inspection, strengthen the tour inspection by region, especially strengthen the inspection of key areas, key parts and key equipment, especially in flood season, combined with water information, do the corresponding emergency treatment, ensure that the unit is always in the best operating state, and go all out to ensure that the energy supply is guaranteed to meet the peak summer; Promote the investigation and management of hidden dangers, refine and optimize the adjustment of parameters, rationally arrange the elimination of equipment, contact and deal with hidden dangers and anomalies found on the scene at the first time, and carefully find the root cause of the problem for frequent failures, and constantly improve the reliability of the unit.

At the same time, the operators of Maerstop hydropower station always pay attention to the water level changes, actively exchange information with the Yellow Committee, timely grasp the water situation information, estimate the incoming water volume, and communicate and coordinate with the provincial adjustment, adjust the load, and strive to run the unit at full load or according to the optimal operating conditions, in order to create better power generation benefits.


】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部
今日热点