陕西省煤层气钻井分公司:煤层气钻探累计突破万米大关
责任编辑:cnlng    浏览:18次    时间: 2024-10-17 11:00:53    | 来源:陕煤集团 作者:张郭朕 张锁锁   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:近日,陕西省煤层气钻井分公司陕煤40006队传来振奋人心的消息,其承钻的延川南煤层气项目,钻机累计进尺成功突破万米大关,这标志着该公司在煤层气钻探工程领域达到了一个新的高度。据悉,该钻机自今年3月份复工以来,井队一直坚持安全和进尺“两手抓”,在钻探过程..

分享到:

近日,陕西省煤层气钻井分公司陕煤40006队传来振奋人心的消息,其承钻的延川南煤层气项目,钻机累计进尺成功突破万米大关,这标志着该公司在煤层气钻探工程领域达到了一个新的高度。

据悉,该钻机自今年3月份复工以来,井队一直坚持安全和进尺“两手抓”,在钻探过程中,面临诸多复杂的地质条件挑战,从松软的泥沙层到坚硬的岩石层再到高压地层等,每一米的钻进都是对钻井技术和钻井设备的严峻考验。该公司凭借先进的钻机设备和精湛的技术团队,职工们精心操作,密切关注检测各项数据,根据地层变化及时调整钻进参数,最终克服了重重困难。截至9月底,陕煤40006队在吉县成功施工4口煤层气井:延21-P2井井深2055m、延21-TP11井井深2750m、延21-TP5井井深2790m、延5-TP1井井深2413m,累计进尺达到10008米,展示了钻井分公司钻井技术的可靠性和先进性。

Recently, Shaanxi coal-bed methane drilling Company Shaanxi coal 40006 team came exciting news, its drilling of Yanchuan South coal-bed methane project, the cumulative footage of the drilling rig successfully exceeded the 10,000 meters mark, which marks the company in the field of coal-bed methane drilling engineering reached a new height.

It is reported that since the rig resumed work in March this year, the well team has been adhering to the safety and footage "two-hand", in the drilling process, facing many complex geological conditions challenges, from soft sand layer to hard rock layer to high pressure formation, every meter of drilling is a severe test of drilling technology and drilling equipment. With advanced drilling equipment and superb technical team, the company's employees carefully operated, closely monitored the data, timely adjusted drilling parameters according to formation changes, and finally overcame many difficulties. As of the end of September, Shaanxi Coal 40006 team successfully constructed 4 CBM Wells in Jixian County: The borehole depth of Yan21-P2 is 2055m, the borehole depth of Yan21-TP11 is 2750m, the borehole depth of Yan21-TP5 is 2790m, and the borehole depth of Yan5-TP1 is 2413m. The cumulative penetration of the borehole reaches 10008 m, demonstrating the reliability and advancement of the drilling technology of the drilling company.

】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部
今日热点