河南开封兴化公司环保项目陆续投运
责任编辑:cnlng    浏览:243次    时间: 2024-03-27 10:25:30    | 来源:中国平煤神马集团   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:去年以来,该公司坚持树牢“环保不好,企业不保”理念,系统推进减污降碳、协同增效,着力打造绿色低碳型企业,建设的环保项目陆续投入运行,从根本上破解了制约公司生产经营和发展瓶颈,进一步释放产能,为公司争取了更大的生存空间。去年3月,该公司建设的生产用盐..

分享到:

去年以来,该公司坚持树牢“环保不好,企业不保”理念,系统推进减污降碳、协同增效,着力打造绿色低碳型企业,建设的环保项目陆续投入运行,从根本上破解了制约公司生产经营和发展瓶颈,进一步释放产能,为公司争取了更大的生存空间。

去年3月,该公司建设的生产用盐水制冷系统项目正式投运。生产用盐水制冷系统采用先进的氟制冷工艺,减少了2个重大危险源,降低了公司安全管理压力。同时,该公司利用生产用盐水制冷系统的大容量储罐存储低温盐水,对制冷机组实行削峰填谷运行模式,进一步降低了企业生产成本。

“该项目是按照集团推行合同能源、合同节水和清洁生产管理模式,助推节能环保达标升级要求建设的环保节能项目。项目建成投运后,进一步降低了综合能源消耗,实现了安全生产和环保节能等工作跨越式发展,增强了企业竞争力,为打造精细化工园区奠定了良好基础。”该公司有关负责人说。

今年以来,该公司通过运行生产用盐水制冷系统,每月节约费用50余万元。同时,因系统自动化程度较高,该公司进一步压减了岗位操作人员,实现安全高效生产。

此外,为更好地解决生产过程中产生的废水,近两年,该公司围绕清洁生产目标,建设了糖精高盐废水无害化处理项目和废酸水综合利用优化改造项目。其中,糖精高盐废水无害化处理项目于去年建成投入运行,通过树脂吸附回收水中的氯化钠等副产品,实现减污降碳,做到资源回收利用。

Since last year, the company has adhered to the concept of "environmental protection is not good, enterprises are not guaranteed", systematically promoted pollution reduction and carbon reduction, synergies, and focused on building green and low-carbon enterprises, and the environmental protection projects built have been put into operation, fundamentally breaking the bottleneck restricting the company's production, operation and development, further releasing production capacity, and fighting for a greater living space for the company.

In March last year, the production of salt water refrigeration system project built by the company was officially put into operation. The production brine refrigeration system adopts advanced fluorine refrigeration process, which reduces two major hazard sources and reduces the company's safety management pressure. At the same time, the company uses the large capacity storage tank of the production of brine refrigeration system to store low-temperature brine, and implements the operation mode of peak cutting and valley filling for the refrigeration unit, which further reduces the production cost of the enterprise.

"This project is an environmental protection and energy conservation project in accordance with the group's implementation of contract energy, contract water saving and clean production management model, and promote the construction of energy conservation and environmental protection standards and upgrading requirements." After the project was completed and put into operation, it further reduced the comprehensive energy consumption, realized the leapfrog development of production safety, environmental protection and energy saving, enhanced the competitiveness of the enterprise, and laid a good foundation for building a fine chemical park." The person in charge of the company said.

Since the beginning of this year, the company has saved more than 500,000 yuan per month by running the production of saltwater refrigeration system. At the same time, due to the high degree of automation of the system, the company further reduced the number of post operators to achieve safe and efficient production.

In addition, in order to better solve the wastewater generated in the production process, in the past two years, the company has built a harmless treatment project of saccharin high-salt wastewater and a comprehensive utilization and optimization project of waste acid water around the goal of clean production. Among them, the harmless treatment project of saccharin high-salt wastewater was completed and put into operation last year, and by-products such as sodium chloride in water are recovered by resin adsorption to achieve pollution reduction and carbon reduction, so as to achieve resource recycling.





】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部