摘要:金川水电站位于四川省阿坝藏族羌族自治州金川县、马尔康市境内,是四川省重点能源项目,总装机容量860兆瓦,安装4台215兆瓦混流式水轮发电机组。座环是机组埋件的核心,是机组过流部件的重要组成部分,和混凝土结构一起支撑发电机、水轮机等重要部件,也是机电设备中..
金川水电站位于四川省阿坝藏族羌族自治州金川县、马尔康市境内,是四川省重点能源项目,总装机容量860兆瓦,安装4台215兆瓦混流式水轮发电机组。座环是机组埋件的核心,是机组过流部件的重要组成部分,和混凝土结构一起支撑发电机、水轮机等重要部件,也是机电设备中的第一个安装大件。金川水电站工程机组座环采用工厂化模式在厂外加工再进行现场组装、调整和焊接,组装后总高度4.2米,最大外径10.685米,整体重量107吨,分为2瓣,分瓣件在安装间封焊。 Jinchuan Hydropower Station is located in Jinchuan County and Malkang City, Aba Tibetan and Qiang Autonomous Prefecture, Sichuan Province. It is a key energy project in Sichuan Province, with a total installed capacity of 860 MW and four 215 MW mixed-flow turbine generators installed. The seat ring is the core of the unit embedded parts, is an important part of the unit flow parts, and the concrete structure together to support the generator, hydraulic turbine and other important parts, but also the first installation of mechanical and electrical equipment. The seat ring of the unit of Jinchuan Hydropower Station is processed outside the plant in factory mode and then assembled, adjusted and welded on site. After assembly, the total height is 4.2 meters, the maximum outer diameter is 10.685 meters, and the overall weight is 107 tons. It is divided into 2 pieces, and the split parts are sealed and welded in the installation room. |