漳州核电2号机组500kV倒送电高质量完成
责任编辑:cnlng    浏览:598次    时间: 2024-10-15 10:40:20    | 来源:中国核电工程有限公司   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:为确保500kV倒送电工作顺利推进,在项目部各级领导的大力支持下,中核工程漳州项目部联合各单位技术骨干组成攻坚小组,始终将安全、质量放在首位。在安装、调试工作中攻坚小组充分发挥团队协作精神,深入贯彻 “整体·协同”年专项行动部署,进行横向协同与纵向贯通..

分享到:

为确保500kV倒送电工作顺利推进,在项目部各级领导的大力支持下,中核工程漳州项目部联合各单位技术骨干组成攻坚小组,始终将安全、质量放在首位。在安装、调试工作中攻坚小组充分发挥团队协作精神,深入贯彻 “整体·协同”年专项行动部署,进行横向协同与纵向贯通,创新工作方法,安全高效地完成了系统安装调试、标准化验收、网络安全评测、质监验收及涉网验收等关键工序;同时,在实现各关键路径的过程中,攻坚小组展现了卓越的团队协作和无私奉献的华龙精神,组织了500kV倒送电试验先决条件梳理会、专项技术讨论会、启动方案推演会及启动试验现场演练,梳理试验前的未完项以及试验过程中可能存在的问题和风险,并制定充分有效的应对措施予以跟踪落实,全力以赴确保工程的安全与质量。

华龙批量化,漳州率先行。漳州核电2号机组500kV倒送电充分吸取1号机组经验,坚持安全第一、质量第一,强化风险管控,以严慎细实的工作态度验证了500kV倒送电相关设备及安装调试工作的可靠性,为后续2号机组全面调试奠定基础。

In order to ensure the smooth progress of 500kV power transmission work, with the strong support of leaders at all levels of the project department, the Zhangzhou Project Department of China Nuclear Engineering joined forces with technical backbone units to form a key team, always putting safety and quality in the first place. In the installation and commissioning work, the team gave full play to the teamwork spirit, thoroughly implemented the special action deployment of the "whole · coordination" year, carried out horizontal coordination and vertical penetration, innovative working methods, and safely and efficiently completed the key processes such as system installation and commissioning, standardized acceptance, network security eva luation, quality supervision and acceptance, and network-related acceptance. At the same time, in the process of realizing each critical path, the team demonstrated excellent teamwork and selfless dedication of the Hualong spirit, organized the 500kV reverse power supply test prerequisite review meeting, special technical discussion, startup plan review meeting and startup test field drill, and reviewed the unfinished items before the test and possible problems and risks in the test process. And formulate adequate and effective countermeasures to follow up and implement, and go all out to ensure the safety and quality of the project.

Hualong batch, Zhangzhou first line. Zhangzhou Nuclear Power Unit 2 has fully learned from the experience of Unit 1 for 500kV reverse power supply, adhered to safety first, quality first, strengthened risk control, verified the reliability of 500kV reverse power supply related equipment and installation and commissioning work with a rigorous and detailed working attitude, and laid the foundation for the subsequent comprehensive commissioning of Unit 2.


】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部
今日热点