沪东中华造船LNG船产能倍增战略驶入“快车道”
责任编辑:cnlng    浏览:659次    时间: 2024-06-05 11:24:16    | 来源:沪东中华船   

免职声明:本网站为公益性网站,部分信息来自网络,如果涉及贵网站的知识产权,请及时反馈,我们承诺第一时间删除!

This website is a public welfare website, part of the information from the Internet, if it involves the intellectual property rights of your website, please timely feedback, we promise to delete the first time.

电话Tel: 19550540085: QQ号: 929496072 or 邮箱Email: Lng@vip.qq.com

摘要:5月31日,沪东中华船长兴造船厂区2号船坞一派繁忙景象。在拖轮的牵引下,两艘17.4万立方米LNG船缓缓驶出船坞,另两艘大型LNG船半船完成起浮移位作业。这是继3月24日后,沪东中华船再度呈现四船并建、两船出坞、两船起浮的盛景,且坞期同比缩短近20%,达到世界先进水..

分享到:

5月31日,沪东中华船长兴造船厂区2号船坞一派繁忙景象。在拖轮的牵引下,两艘17.4万立方米LNG船缓缓驶出船坞,另两艘大型LNG船半船完成起浮移位作业。这是继3月24日后,沪东中华船再度呈现四船并建、两船出坞、两船起浮的盛景,且坞期同比缩短近20%,达到世界先进水准。标志着沪东中华船大型LNG船坞内四船并列半串联建造模式进入了批量化、常态化、标准化、节拍化新阶段,LNG船产能倍增战略迈向全面提速新境界。

卡能源LNG驻厂组组长盖尔,商船三井(中国)副总经理虞勤翀,商船三井驻厂监造组组长村中乔,上海中远海运液化天然气投资有限公司技术管理部技术总监吴红兵,美国船级社上海地区经理陆介宇,中国船级社大型LNG新造船项目部经理郭显亭,沪东中华船总经理助理张秀峰出席H1793A出坞仪式。

商船三井(中国)副总经理虞勤翀,商船三井驻厂监造组组长下田盛市,上海中远海运液化天然气投资有限公司技术管理部技术总监吴红兵,ABS上海地区经理陆介宇,CCS大型LNG新造船项目部经理郭显亭,沪东中华船LNG副总建造师张少鹰出席H1881A出坞仪式。

On May 31, 2019, the No. 2 dock of Zhonghua Changxing Shipbuilding Factory in east China was busy. Under the tug of the tugboat, two 174,000 cubic meters of LNG vessels slowly sailed out of the dock, and the other two large LNG vessels completed the floating and shifting operation. This is following March 24, Hudong Zhonghua ship once again presented four ships in parallel construction, two ships out of dock, two ships floating, and the dock period was shortened by nearly 20%, reaching the world's advanced level. It marks that the four-ship parallel semi-series construction mode in Hudong Zhonghua Ship's large LNG dock has entered a new stage of mass, normalization, standardization and rhythm, and the LNG ship capacity doubling strategy has moved to a new stage of comprehensive acceleration.

Gail, leader of LNG Resident Group of Ka Energy, Yu Qinchong, Deputy General manager of Merchant Marine Mitsui (China), Joe Muranaka, leader of Merchant Marine Mitsui Resident Supervision Team, Wu Hongbing, Technical Director of Technical Management Department of Shanghai COSCO Shipping LNG Investment Co., LTD., Lu Jieyu, Regional Manager of American Bureau of Shipping Shanghai, Guo Xianting, Manager of Large LNG New Shipbuilding Project Department of China Classification Society, Zhang Xiufeng, Assistant general manager of Hudong Zhonghua Ship, attended the docking ceremony of H1793A.

Deputy General Manager of Merchant Marine Mitsui (China) Yu Qinchong, Leader of Merchant Marine Mitsui Resident Supervision Team Moriichi Shimoda, Technical Director of Technical Management Department of Shanghai COsco Shipping LNG Investment Co., LTD. Wu Hongbing, ABS Shanghai Regional Manager Lu Jieyu, CCS Large LNG New shipbuilding Project Manager Guo Xianting, Zhang Shaoying, Deputy chief builder of Hudong Zhonghua LNG, attended the docking ceremony of H1881A.


】【打印繁体】【投稿】 【收藏】 【推荐】 【举报】 【评论】 【关闭】【返回顶部
今日热点