摘要:本次锅炉水压试验,锅炉设计压力为7.3MPa,超压试验压力为9.125MPa,试验过程中,各系统均按照施工方案和规范要求进行升压、保压、降压、泄压,经联合检查受压元件金属壁和焊缝均未出现泄漏及湿润现象,受压元件无明显残余变形,压降符合设计和规范要求。揭西县生活..
本次锅炉水压试验,锅炉设计压力为7.3MPa,超压试验压力为9.125MPa,试验过程中,各系统均按照施工方案和规范要求进行升压、保压、降压、泄压,经联合检查受压元件金属壁和焊缝均未出现泄漏及湿润现象,受压元件无明显残余变形,压降符合设计和规范要求。 揭西县生活垃圾环保处理中心(揭西县环保能源产业园)是广东省重点建设项目,规划建设规模为处理生活垃圾600吨/日、餐厨垃圾100吨/日,年发电量约1亿度。项目建成后将助推揭西实现生活垃圾处置“减量化、无害化、资源化”,为改善当地人居环境贡献广东环保力量。 下阶段,揭西县生活垃圾环保处理中心将继续严格按照既定的时间节点,倒排工期,明确责任,有序推进用电受电等工程节点,确保工程如期完成。 In this hydraulic pressure test of boiler, the boiler design pressure is 7.3MPa, and the overpressure test pressure is 9.125MPa. During the test, all systems are carried out in accordance with the construction scheme and the requirements of the code to boost, maintain, reduce and relieve pressure. After joint inspection, no leakage or wetting phenomenon occurs on the metal walls and welds of the pressure elements, and there is no obvious residual deformation of the pressure elements. The pressure drop meets the design and specification requirements. Jiexi County domestic Waste Environmental Protection Treatment Center (Jiexi County Environmental Energy Industrial Park) is a key construction project in Guangdong Province, the planned construction scale is 600 tons of domestic waste treatment/day, 100 tons of kitchen waste/day, annual power generation of about 100 million KWH. After the completion of the project, it will help Jiexi realize the "reduction, harmless and resource" of domestic waste disposal, and contribute Guangdong's environmental protection force to improve the local living environment. In the next stage, Jiexi County domestic waste Environmental protection treatment Center will continue to strictly follow the established time node, reverse the schedule, clear responsibilities, orderly promote the power supply and other engineering nodes, to ensure that the project is completed on schedule. |